By using this site, you agree with our cookies usage in accordance with our cookies policy. You can always disable cookies in your browser settings.

6+

6+

Kinet Railway Solutions produces first Vande Bharat sleeper body

9 April 2026
Reading time ~ 1 min
First body for the head coach for the Vande Bharat sleeper
First body for the head coach for the Vande Bharat sleeper by Kinet RS. Source: Kinet Railway Solutions
Savenkova Ekaterina, Editorial Contributor to International Projects of ROLLINGSTOCK Agency
Reading time ~ 1 min
Stolchnev Alexey, Russian Projects Editor, ROLLINGSTOCK Agency

India: Kinet Railway Solutions, the joint venture between Russia’s TMH and India’s Rail Vikas Nigam Ltd (RVNL), has announced completion of the first body for the head coach.

Rolling stock production is currently underway at the Marathwada Rail Coach Factory in Latur. A prototype 16-car trainset, designed for an operational speed of 160 km/h, is expected to be unveiled in June.

Under a contract signed in 2023 between national operator Indian Railways and Kinet Railway Solutions, the joint venture will supply 120 trains (1,920 coaches) together with 35 years of maintenance support. TMH previously stated that the total value of the contract could reach $6.5 bln. Last year, Kinet presented a full-scale mock-up of a four-berth first-class sleeper compartment and an updated exterior design concept.

The first Vande Bharat sleeper EMUs entered service in India in January, manufactured at BEML’s Bengaluru plant under a contract with Indian Railways for 10 trainsets. In parallel, a consortium of Titagarh Wagons and Bharat Heavy Electricals Ltd is delivering 80 additional Vande Bharat sleeper EMUs comprising 1,280 coaches.

Follow us on LinkedIn and Twitter!