By using this site, you agree with our cookies usage in accordance with our cookies policy. You can always disable cookies in your browser settings.

6+

6+

Alstom completes Coradia Stream dynamic testing for Romania

28 August 2024
Reading time ~ 1 min
The Coradia Stream for Romania
The Coradia Stream for Romania. Source: Trains in Europe/youtube
Savenkova Ekaterina, Editorial Contributor to International Projects of ROLLINGSTOCK Agency
Reading time ~ 1 min
Stolchnev Alexey, Russian Projects Editor, ROLLINGSTOCK Agency

Romania: During the tests at the Făurei test site, the six-car trains reached the speeds of up to 160 km/h, according to the manufacturer. The testing of three trains started with the complex tests at the VUZ Velim test centre in Czechia, and now will continue in Romania, where the trains will undergo trial run on several lines.

After completion of the tests and trials, the vehicles will be allowed to carry passengers.

The Coradia Stream is a 350-passenger low-floor EMU, equipped with a digital passenger counting system. The first train is due to enter service by the end of the year.

Coradia Stream dynamic testing at the Romanian test site. Source: Alstom

In March 2022, Alstom signed a contract that includes a firm part and an already exercised option for the supply of 37 EMUs to Romania. The contract was originally awarded to a consortium of local Astra Vagoane and CRRC, which had designed the train specifically for the project, but the court eventually awarded the contract to the French manufacturer.

Follow us on LinkedIn and Twitter!