By using this site, you agree with our cookies usage in accordance with our cookies policy. You can always disable cookies in your browser settings.

6+

6+

Locomotives. Filter by tags

Publication period from to
Selected tags
Alstom 8
BMZ 2
CAF 2
CRRC 7
CZ Loko 3
Caterpillar 2
DMZ 1
Express Service 2
FPS 1
Hyundai Rotem 1
Kalugaputmash 1
Kinki Sharyo 1
Kolomna Plant 1
LTZ 2
LocoTech 1
Metrowagonmash 1
Mitsubishi 1
NEVZ 2
Newag 2
Pesa 3
Progress Rail 3
Siemens Mobility 6
Sinara Group, STM 6
Stadler Rail 2
Steelwheel 1
TMH 10
TVZ 2
Talgo 2
Transmash 1
Türasaş 1
Ural Locomotives 2
Uralvagonzavod (UVZ) 1
Vossloh RS 1
Wabtec 10
ZIKSTO 1
CMB.Tech 1
Cognitive Pilot 1
Cummins 1
Hitachi Rail STS 1
Key Systems and Components (KSC) 2
NPO Elektromashina 1
Rail Vision 1
TMH Smart Systems 1
ZTR 1
BDZ 1
BHP Group 1
CEPC 1
CHN Energy 1
Deutsche Bahn (DB) 1
ENR 1
Energy Absolute 1
Fortescue 1
Gazpromtrans 2
ICC 1
Indian Railways (IR) 1
KTZ 3
MÁV-Start 1
Nornickel 1
Operail 1
PKP Cargo 1
PKP Intercity 3
Polregio 1
RAI 1
RZD 10
Rail Cargo 1
Railpool 1
Rio Tinto 2
TCDD 1
Transnet 1
TrasnNamib 1
Traxtion Rail 1
Union Pacific 1
VLI 1
Vale 1
Yakutian Railways 1
ČD 1
IDF (Russia) 1
NAT 1
Promzheldortrans 1
Rosstandart 1
TK 150 1
TK 45 1
Australia 2
Brazil 2
Bulgaria 1
China 1
Cuba 1
Czech Republic 2
Egypt 1
Estonia 1
Finland 2
France 2
Germany 2
Guinea 1
Hungary 2
India 1
Iran 1
Kazakhstan 3
Namibia 1
Poland 4
Russia 25
South Africa 1
Spain 1
Thailand 1
Turkiye 1
USA 4
1 2 3 4 5 6 7
Andrey Romanchikov: “Virtual coupling is in demand at all the markets of TMH presence”
Andrey Romanchikov: “Virtual coupling is in demand at all the markets of TMH presence”

Russia: Andrey Romanchikov, Managing Director for the Intelligent Control Systems Development at TMH, CEO of TMH Smart Systems Group, told about the company's activities in digital solutions for rolling stock.

30 September 2022
Advertising
Wabtec made step forward to a large order in Kazakhstan
Wabtec made step forward to a large order in Kazakhstan

USA: Wabtec and the Kazakhstan Temir Zholy national railway operator signed a memorandum of understanding for the prospective delivery of 150 battery shunters, as well as on the mainline fleet overhauling for LNG traction.

29 September 2022
Express Service targets Bulgarian locomotive overhaul market
Express Service targets Bulgarian locomotive overhaul market

Bulgaria: The only locomotive manufacturer in the country specializing in small shunters is building a new workshop with an area of about 4,000 m2 for the development of overhaul competencies.

20 September 2022
CRRC battery locomotive to be tested in Thailand
CRRC battery locomotive to be tested in Thailand

Thailand: The EA energy company has received the first battery-powered vehicle from a manufacturer. This is the second export delivery of battery-powered locomotives for CRRC.

18 September 2022
TMH and components producers received preferential loans for production development
TMH and components producers received preferential loans for production development

Russia: Manufacturers are approved to receive 8 loans from the state Industrial Development Fund to develop the previously imported components and to increase production.

2 September 2022
Shunter by Operail and CZ Loko approved for operation in Finland
Shunter by Operail and CZ Loko approved for operation in Finland

Finland: Following the successful completion of a six-month trial, the Operail freight operator from Estonia received approval to commission the C30-MF diesel locomotive produced together with CZ Loko.

1 September 2022
New issue of the TMH Vektor magazine No. 2 (49) 2022 is published in English
New issue of the TMH Vektor magazine No. 2 (49) 2022 is published in English

Russia: The publication includes materials about new rolling stock and components by TMH, the experience of locomotive delivery for Nornickel, the results of the TMH: New Vision acceleration program and much more.

27 August 2022
Rail Vision tests an updated computer vision system on Rio Tinto network
Rail Vision tests an updated computer vision system on Rio Tinto network

Australia: The Main Line computer vision system will be tested on the heavy-haul long distance locomotives of the Rio Tinto mining company in the Pilbara region over the next three months.

16 July 2022
Rolling stock procurement in RZD: 2021 overall results
Rolling stock procurement in RZD: 2021 overall results

Russia: The national railway company published its 2021 annual report. ROLLINGSTOCK has analyzed and compared it with the figures of 2020.

11 July 2022
1 2 3 4 5 6 7